Rehabilitation and expansion of Al-Faraa Dam | Construction of a conveying sewage line with a diameter of 12 inches and a length of 2 km | | Rehabilitation of Al-Faraa Dam for rainwater harvesting and protect it from sewage pollution | 6,000 | 70,000$ | Indonesia | | 2020_2021 | under implementaion |
Rehabilitation of the Artas station and the construction of a manhole for the discharge of sewage tanks | Supplying new pumps to the station, building a manhole, rehabilitating and maintaining the station | | Rehabilitation of pumping station pumps and construction of Manhal | 7,000 | 143,605$ | French Agency | | 2020-2021 | under implementaion |
Supply and installation of Al-Faraa well pump | Supply and installation of a 80 cubic metre/hour submersible pump with its entire parts | | Replacing the current pump in the well due to damage, thereby improving the quality and efficiency of pumping water into Al Faraa Camp | 5,956 | 25,143$ | PWA | | 2020_2021 | under implementaion |
Rehabilitation of Marda village water network | Rehabilitation and expansion of 3/4 inch, 2-inch, 4-inch water distribution lines with a total length of 16 km, as well as rehabilitation of a ground tank | | Improved water quality service, equitable distribution and removal of water pollution in the region | 2,500 | 769,108$ | PWA | | 2020_2021 | under implementaion |
Construction of a water tank for the town of Jayyous | Construction of a 500-cup high water tank, finishing the first floor of the reservoir in addition to demolishing the existing reservoir | Tanks | Construction of a 500-cup high water tank | 4,000 | 420,000$ | PWA | | 2020_2021 | completed |
Completion of the extension and expansion works of the main water line in Tal Al-Samoud | Installing the main water line with a diameter of 6 inches, in addition to water lines with diameters of 1/2 inch, 1 inch, 2 inches, 4 inches and 6 inches, and rehabilitation works for existing manholes, making additional manholes, in addition to supplying mechanical parts and pipes of different diameters. | Internal water network | Improving water service and achieving equity in the distribution | 25,000 | 225,405$ | UNICEF | | 2020 | completed |
Additional works for the Wastewater project in Artas village | Replacing a section of the main sewage line and rehabilitating the sewage station | sanitation | Solve the sewage problem in the village of Artas | 2,500 | 44,000$ | PWA | | 2019 | completed |
Rehabilitation of Ar-Rihiya water well | The rehabilitation work in the well included the supply of a 180 hp electric motor and its installation in the area of ??the well. As well as the supply and installation of an electrical panel with a VFD system with a PLC logic controller that was programmed to facilitate the process of controlling the vertical pump in the well. | Rehabilitation of wells | Ensuring the continuation of the provision of potable water service from the service areas, increasing coverage, especially in high areas, and reducing waste | | 47,000$ | Qatar Charity Association | | 2014_2020 | completed |
Construction of a water transmission line for the Joint Services Council for villages north and northwest of Jerusalem | 3-inch 1.7 km and 2-inch 750-meter-long water line for landfill and 125 cubic meters underground tank | | This project is considered one of the environmental projecs | 20,000 | 176,667$ | PWA | | 2018-2019 | under implementaion |
Supply and installation of a pump to Jericho water well No. (1) - Aqabat Jaber | Supplying a pump to be installed permanently inside Jericho well No. (1) | | Improve the quantity of potable water and ensure fair distribution in service areas | 9000people | 118,834$ | Neuchatel &Besancon provinces and PWAs budget | | 2018-2019 | under implementaion |
Project for reuse of treated water from Jenin treatment plant | Develop the wastewater treatment plant in Jenin.Clean Al Muqatta valley from wastewater, as well as the establishment of a third-grade treatment plant, a pumping station, 2-km long transmission pipelines, and irrigation networks for farmers | | First integrated project for the reuse of treated water on commercial basis .The project aims at reusing treated water in agriculture and the development of agricultural areas as well as minimize treatment of wastewater inside the Green Line, clean Al Muqatta valley from wastewater | 200farmer | 4,316,666$ | The Dutch government and ANERA | | 2013_2020 | under implementaion |
Reuse project in Western Nablus | Construction of a pumping station, transmission pipeline,reservoirs,and irrigation networks for farmers. | | An integrated project for the reuse of treated water on commercial basis as the project seeks to develop the treatment plant and reuse treated water in agriculture | 200farmer | 12,833,333$ | KFW | | 2017-2022 | under implementaion |
Project to complete establishment of wastewater networks west of Nablus | Construction of five wastewater networks (30 km long)in five communities. | sanitation | Improve the sanitation services, increase quantity of treated water in addition to providing a healthy environment for villages west of Nablus by closing off the cesspits and treating industrial water | 20,000 | 9,477,500$ | KFW | | 2017_2020 | under implementaion |
Rehabilitation project of Al-Bireh station and supplying water meters to Jerusalem Water Utility | Change and install water meters. Water master plan. Sanitation master plan. Expansion of Al-Bireh Station. Change the equipment of the station. | | The project aims to prepare a comprehensive water and sanitation plan, reduce the rate of waste and rehabilitate Al-Bireh treatment plant to improve sanitation services in the town in addition to increasing the efficiency of water systems by installing water meters | 300000people | 11,150,000$ | German government managed by the German Development Bank | | 2015-2020 | under implementaion |
Jericho Wastewater Project (First and second phase) | The first phase included the construction of a 15 km long sewage network, a pumping station, and 585 household connections. The second phase included the construction of a 24 km sewage network, a pumping station, and the installation of 755 household connections. | sanitation | Improve sanitation services by expanding the network and increasing number of residents served | 2,000 | 10,938,000$ | USAID | | 2015_2019 | completed |
Establishment of the Central Treatment Plant in Gaza - Phase 1 | Construction of a wastewater treatment plant with a capacity of 60,000 cubic meters per day, with renewable energy components with a capacity of 5 MW, tanker lines, pumping stations, and the necessary electromechanical work, as well as the project includes maintenance and rehabilitation work for Sheikh Ajlin plant | | The project aims to establish a sewage treatment plant produced from Gaza City and the Central Governorate, with a large capacity and high technology, in addition to reusing the treated water in agriculture. | 600,000people | 75,790,000$ | KFW | | 5015_2019 | under implementaion |
Rehabilitation of water wells | The project includes the supply of spare parts and filters for the maintenance and installation of generators, in addition to electromechanical maintenance for some of the existing wells. | Rehabilitation of wells | Improving the operating system and increasing the operating efficiency of wells | 1,000,000people | 400,000$ | UNICEF | | 2018-2019 | under implementaion |
Gaza Sustainable Water Supply Program - Consulting services for the implementation of projects - the second phase of supervising contracts for the southern conveyor line | The project includes participation in the bid evaluation process and supervision of the implementation of Contract No. 1 and the improvement of Mekorot works, and the improvement of water networks (AWSNI) - Central Region and Khan Yunis | | Improving the level of water supply for the residents of the Gaza Strip | | 1,999,930$ | KFAED | | 2018_2021 | under implementaion |
Establishment and operation of the Rolling Program Coordination Unit (G_PCU) for Gaza Water Supply - Phase II | Provide technical support to PWA regarding the sustainable implementation of the program for supplying the Gaza Strip with water | | Supplying Gaza Strip with water | 1,940,000people | 1,049,400$ | Austrian Development Agency | | 2018_2021 | under implementaion |
Maintenance and rehabilitation project for Deir al-Balah desalination plant of limited quantity (600 m3/day) | Supplying and installing some components related to the external structure of the desalination plant, such as the metal roof and the plant walls | | Providing the residents of Deir al-Balah with suitable quantitative and qualitative consumable water | 12,000 | 207,716$ | Austrian Development Agency | | 2018_2019 | completed |
Construction of a wastewater network and treatment unit in Al-Mawasi | The project includes the extension of sewage networks and the closure of cesspits, with the establishment of a special biological treatment unit | | Reducing groundwater pollution | 10,000people | 571,549$ | ACF | | 2018_2019 | under implementaion |
Maintenance of water and sanitation facilities in the Gaza Strip | Maintenance of water and sewage networks and utilities in different areas of the Gaza Strip | | Optimize the operating system and increase the efficiency of the facilities | 1,000,000people | 636,027$ | Red Cross | | 2018_2019 | under implementaion |
Rehabilitation of Al_Shifa Hospitals water network | The project includes replacing the old and worn out internal water networks, in addition to installing pumps to improve the distribution system within the hospital departments | | Improving water quality in the hospital departments | Staff and patients | 110,000$ | UNICEF | | 2018_2019 | under implementaion |
Supply and installation of the solar PV system for Al-Zahraa Well and temporary treatment plant in Khan Yunis | The project includes the supply and installation of solar cells with the necessary construction and electrical work | | Ensure plant operation and increase treatment efficiency to reduce seawater pollution | 200,000people | 160,000$ | UNICEF | | 2018-2019 | under implementaion |
Construction of an emergency warehouse in Khan Younis with spare parts for water and sanitation | Building a warehouse and providing spare parts | | Provide a safe place to store the basic items needed for maintenance work | 1,500,000people | 345,000$ | UNICEF | | 2018-2019 | under implementaion |
Establishment of two water tanks in the Al-Amal and Al-Satar area | The construction of two 5,000 cubic meters of water reservoirs in the Al-Satar and Al-Amal area of Khan Younis with pumping stations in addition to the construction of a service building within the site of each reservoir, the project includes extending the necessary lines and networks and connecting them to existing lines. | Tanks | Improving water situation, increasing per capita, and improving water quality through the mixing process with desalinated water | 40,000 | 2,800,000$ | European Union | | 2013-2019 | completed |
Construction of a sewage network in Aqabat Jaber camp (Phase II) | | | Improving sanitation services, reducing the risk of absorption drilling, and providing a healthy environment | | 6,000,000$ | Japanese Government | | 2019-2021 | under implementaion |
Project of maintenance and cleaning of Jenin wastewater treatment plant | Supply and install pumps and ventilation generators and clean treatment pools of deposited materials | sanitation | Improve sanitation services | 45,000 | 103,048$ | PWA | | 2018-2019 | completed |
Water and Sanitation Services Improvement Project - Jericho | Extension and installation of 470 home connections, installation of 430 pre-paid water meters and construction of a 2.5 km transmission line from the Jericho Treatment Plant to the Agricultural Industrial Zone | | Improving water and sanitation services, reducing the risk of absorption drilling, and providing a healthy environment | 3500people | 1,029,411$ | JICA | | 2018_2019 | under implementaion |
Extension of wastewater connections _ Jericho | Extension and installation of 650 home connections, extension of secondary subroutines and maintenance of parts of the existing network | sanitation | Improving sanitation services, reducing the risk of absorptive drilling, and providing a healthy environment | 650families | 109,055$ | PWA | | 2018-2019 | under implementaion |
Salfit Treatment Plant and Sanitation System Project | construction of a treatment plant for the city of Salfit with a capacity of 2000 cubic meters / day | sanitation | This project aims to improve sanitation services in the Salfit area and provide a healthy environment for the residents of the area. | 16,000 | 8,920,000$ | KFW | | 2017-2021 | under implementaion |
Reuse project at Al Arroub station | Establish a system for the reuse of wastewater,equipment for drying and treating sludge in addition to installing solar panels with a capacity of 50kw/hour | sanitation | This is considerable a pioneering project in the use of sludge in agriculture and the use of solar energy. The project aims to develop the agricultural sector through the use of treated water. | 9000inhabitants and 90 farmers | 2,100,000$ | EU | | 2017-2021 | under implementaion |
Aneen Wastewater project | Construction of a wastewater treatment plant with a capacity of 700 cubic metres/day, a wastewater network (9 km long) and 550 households connections. | sanitation | This is an integrated project for the protection of the environment from wastewater, improving sanitation services, in addition to using solar energy. . | 3000inhabitants and 30 farmers | 4,083,333$ | EU | | 2017-2021 | under implementaion |
Wadi Al Nar wastewater line project | Construction of a treatment plant and sewage networks for 12 communities, and the construction of conveyor lines | sanitation | Improving the sewage structure and services in an area threatened by confiscation and settlement expansion in the Jerusalem area | 200000people | 1,666,000$ | PWA | | | under implementaion |
Wastewater management project - Hebron | Establish the regional wastewater treatment plant south of Hebron with a capacity of 1500 cubic meters/day, and construction of sewage lines. | | Improve sanitation services and preserve a healthy environment, in addition to protecting underground water from contamination. | 400,000 | 45,948,383$ | EU,AFD and the World Bank | | 2012-2021 | under implementaion |
Rehabilitation of Al Rahma water tank | Change the horizontal pumping system and turn it into a vertical pumping system with the necessary mechanical work to suit the change. | Tanks | Improving the capacity of the pumping station, increasing operating efficiency, and utilizing the full capacity of the tank. | 20,000people | $170,706 | ICRC | 100% | 2018 | completed |
Construct of Al Fukhari water reservoir | Construct a water reservoir with a capacity of 3000 cubic meters in Al-Fokhari area in Khan Yunis with a pumping station, in addition to building a service constructing on the side of the reservoir. The project involved also the installation of needed lines and networks as well as their connection with existing lines. | Tanks | Improve the water situation and increase the per capita share of water in those areas that suffer from severe water shortage. | 5000people | 930,000$ | ANERA | 100% | 2017-2018 | completed |
Construction of a water reservoir in Al Shokeh | Construction of a water reservoir with a capacity of 3,000 cubic meters in Al Shokeh area in Rafah with a pumping station, in addition to constructing a service building on the reservoir site. the project involved also the installation of needed lines and networks as well as their connection to existing lines. | Tanks | Improving the water situation and increasing per capita water, as these areas suffer from severe water shortages. | 5000 | 1,017,000$ | ANERA | 100% | 2017-2018 | completed |
Construction of a water tank and water conveyor line in Iraq Burin | Construction of a 300-cubic-meter suspended water tank, supplying and installing a 4-inch diameter water conveyor line with a length of 600 meters, in addition to constructing a 25-cubic-meter-per-hour pumping station for the village. | Tanks | Improving the water system in the village of Iraq Burin by building a reservoir for the village and a conveyor line; Which will lead to reducing losses in the network, maintaining the life span of the water network, and reducing maintenance burdens on the local council | 1,000 | 375,063$ | PWA | | 2018-2019 | completed |
Agricultural Wells Rehabilitation Project in Qalqilya Governorate (Phase II) | Rehabilitation of wells and providing them with electrical and mechanical equipment necessary to improve their productivity, which will increase the amount of water available to farmers in the area. | Rehabilitation of wells | Rehabilitation of 5 agricultural wells | 2,000 | 502,467$ | PWA | | 2018_2021 | under implementaion |
Construction of an internal water distribution network in Faqqua | Extension of water lines for a new internal water network of different diameters, including 6 inches of 150 m long, 4 inches of 700 m long, 3 inches of 2250 m long, 2 inches of 13880 m long, 1 inch of 6800 m, and 3/4 inch of 8000 m length, in addition to insta. | Internal water network | Increasing the quantities of potable water and improving the quality and reliability of the water supply service | 4,410 | 1,151,060$ | PWA | | 2018-2020 | completed |
Rehabilitation of the water network of Zatara village | Rehabilitation of the water network of different diameters | Internal water network | Increasing the quantities of potable water, reducing losses, and improving the quality and reliability of the water supply service | 7,849 | 235,287$ | PWA | | 2018-2019 | completed |
construction of a conveyor water line in Rujeib -Beit Furik | Supply and installation of pipes with a diameter of 12 inches, a length of 3 km, a diameter of 8 inches, and a length of 4 km | Water line | Providing the area of ??Beit Furik and Beit Dajan with 80 cubic meters per hour, to improve the water situation by reducing the cost of the cup for the citizen from 10 shekels to 4 shekels and improving the quality of drinking water. | 20,000 | 1,030,599$ | PWA | | 2018-2019 | completed |
Farkha Water Network Rehabilitation Project | Supply and installation of 3-inch water pipes with a length of 1.8 km, 2 inches long 2.8 km and 3/4 inches long 1.5 km | Internal water network | Improving water supply services in Farkha village | 1260people | 259,201$ | PWA | | 2018-2019 | completed |
Supply and installation of a water tank and water lines in wadi al-Dauk village | Extension of 3-inch and 801-metre tanker water line, 431-metre distribution lines, 1480-inch 2-inch distribution lines, 1-inch home links, 500-metre and 345-metre 3/4-inch diameters, installation of a 50-m3 Viper Glass tank and construction of a gate wall around the reservoir | Tanks | Increase the amount of drinking water and reduce the loss rate | 170people | 199,170$ | PWA | | 2018-2019 | under implementaion |
Construction of an internal water network for Khirbet Jabbara village | Construction of a 6-inch diameter conveyor line with a length of 700 m, distribution lines with a diameter of 2 inches and 3 inches, with a total length of 3700 m, and home connections | Internal water network | Increasing the quantities of potable water in service areas, increasing coverage, especially in high areas, and reducing losses | 313 | 222,114$ | PWA | | 2018-2020 | completed |
Construction of an internal water network for Al-Rasheed area | Construction of a 6-inch conveyor line with a length of 3000 meters and distribution lines of 2 inches and 3 inches with a total length of 5,650 meters, and the extension of 300 household connections and the installation of three pumps of different capacities. | Internal water network | Increasing the quantities of potable water in service areas, increasing coverage, especially in high areas, and reducing waste | 5,747 | 541,698$ | PWA | | 2018-2021 | under implementaion |
Building a reservoir, expanding and rehabilitating the water network of Jama`in town | The project includes building a reservoir with a capacity of 1000 m3 and establishing a balance tank, replacing worn-out water lines with a length of 5 km, in addition to rehabilitating and expanding the existing water network with a length of 5 km, extending 5 km of transmission lines, and constructing a pumping station. | Tanks | Improving water services, reducing wastage, and increasing coverage, especially for high areas | 8,000 | 1,500,000$ | ANERA | | 2018-2019 | completed |
Project to complete the restoration of the transmission line in the western countryside of Dura | Rehabilitation of a part of the conveyor line, 8 inches in diameter, with a length of 1200 linear meters, in an area classified as C, in order to increase the amount of potable water in the western countryside and reduce losses in the waterline. | Water line | Increasing the quantities of potable water in service areas and reducing waste | 1,200 | 133,400$ | Action Against Hunger | | 2018-2019 | completed |
Water services improvement project in Jenin municipality | Preparing a structure for activities, reducing waste and improving collection, preparing a plan for managing water services, sharing project results and outputs with neighboring service providers. | | Improving the collection process, increasing the efficiency of municipal workers in the process of planning services and managing losses | 70000people | 4,700,000$ | JICA | | 2017-2020 | under implementaion |
Emergency water and sanitation program in the Palestinian Territories (Phase II) | Design and preparation of tender documents for the following projects:- Rehabilitation of the water system in the villages of Qabalan, Salem, Azmut and Deir al-Hatab 2- Rehabilitation of the water system in the villages of the Joint Services Council for the villages northwest of Nablus (Sebastia Barqa, Deir Sharaf, Beit Amrin, Naqoura, Nisf Jbeil, Agnesnia | | Improving the quantity and quality of drinking water and sanitation services in the Palestinian territories, and ensuring equitable distribution | 35,000 | 5,400,000$ | KFW | | 2016-2021 | under implementaion |
Construction of Civil Defense Reservoir | Construction of a water tank and pumping station in the western Gaza area | Tanks | Increasing water quality and improving supply service | 50000people | 1,095,600$ | KFW | 100% | 2017-2018 | completed |
South Dura Rural Sewage Lines Project (Abu Al-Asja, Raboud, Karza - Abu Al-Arqan) | Supplying a sewage line with a diameter of 700 cm for a distance of 1000 meters | sanitation | The project comes within a series of projects aimed at solving the problem of sewage flow among the communities and homes of the people of the area, specifically in the Abu Al-Asja area, which is adjacent to the stream. The project will benefit more than 500 families who are directly affected by odors and the risk of drowning and flooding. | 4000people | 276,468$ | PWA | 100% | 2018 | completed |
Construction of rainwater drainage system for Beit Jala | | sanitation | Improving sanitation services in the Beit Jala area and preventing rainwater flooding | 3000people | 2,150,000$ | ANERA | 100% | 2017-2018 | completed |
Wastewater project in Artas village | Construction of 180 home connections and rehabilitation of pumping station | sanitation | Improving the wastewater services in Artas village | 2500people | 407,995$ | PWA | 100% | 2017-2018 | completed |
Project to establish a wastewater network in Aqabet Jabr refugee camp (first phase) | Establish a wastewater network (6km long). | sanitation | Improve sanitation services in Aqbet Jaber refugee camp, minimize risks of cesspits,and provide a healthy environment | 8608people | 2,000,000$ | JAICA | 100% | 2017-2018 | completed |
Technical assistance and capacity building project for Jericho treatment plant | Train the staff of Jericho municipality. Develop a plan to reduce water loss. Establish a water and wastewater tariff system. Install sanitation house connictions. | | Develop a plan to operate the plant in addition to building and developing the capacity of maintenance and station operation employees | 25000people | 5,200,000$ | JAICA | 100% | 2012-2018 | completed |
Kafr Qaddoum Water Network Rehabilitation Project - Phase 2 | Supplying water pipes with a diameter of 2 inches and 1 inch and installing them in the internal network with a total length of 12.5 km and the extension of 450 household connections and a pumping station with a capacity of 18 cubic meters per hour | Internal water network | Improving the water system in the village by rehabilitating the old water network and replacing it with a new system, which led to reducing the percentage of losses in the network, improving the quality of drinking water, reducing the maintenance burden on the local council, and increasing collection revenues. | 4300people | 297,047$ | PWA | 100% | 2018 | completed |
Supplying 4-inch diameter water pipes to Burin village | Supplying 4 inch diameter pipes, 245 with a length of 12.2 for each pipe, for Burin village | | Providing pipes to areas threatened with confiscation in the village of Burin | 2844people | 52,723$ | PWA | 100% | 2018 | completed |
Construction of internal water network in Al-Jabaa | Extension of conveyor lines with a diameter of 1 and 2 inches with a length of 1.9 km | Internal water network | Reducing the rate of loss and delivering water to areas that were not accessible | 1200people | 41,388$ | PWA | 100% | 2018 | completed |
Restoration of the conveyor line of al- Shawawra area | Restoration of the conveyor line with different diameters and a total length of 3200, water lines 6 inches in diameter with a length of 3150 m and 4 inches in diameter with a length of 50 m, and the installation of an electromagnetic water meter with a remote control system | Water line | Restoration of the transmission line to reduce loss and increase the quantities of drinking water | 3500people | 121,800$ | ACF | 100% | 2018 | completed |
Construction of a water tank and rehabilitation of the internal water system of Deir Abu Mashal | Construction of a 500 m3 water tank, rehabilitation of an existing manhole, construction of a new manhole, extension of a 1.5 km transmission line from al-Manhole to the new reservoir, extension of a new 25.5 km section in the water network in the area in addition to 650 new home connections | Tanks | Increase drinking water and reduce loss | 4400people | 2,400,000 $ | ANERA | 100% | 2017-2018 | completed |
Construction of a water tank in the village of Bartaa Al Sharqiah | Building a 500-cup high tank and constructing water lines 6 inches in diameter with a total length of 800 m and 4 inches in diameter with a total length of 200 m in the area, in addition to building a remote reading system for the main meter | Tanks | Development of water supply in Bartaa village | 5000people | 434,264$ | PWA | 100% | 2016-2018 | completed |
Rehabilitation of the Water System of the Joint Water Services Council | Constructing 7 km of main carrier lines, 140 km of water distribution lines, in addition to home connections. Building and equipping a 750 m3 water tank. In addition to building a prefabricated tank with a volume of 25 cubic meters. Supplying equipment for operation and maintenance purposes, consulting services for capacity building and improving performance, and advisory services for community awareness. | Integrated water project | Improving drinking water service in the northern West Bank area in general and the drinking water service area of ??the Joint Services Council for the villages west of Jenin in particular. | 20000people | 11,358,720 $ | AFD | 100% | 2014_2018 | completed |
Rehabilitation and expansion of Beit Fajjar water system | Rehabilitation and expansion of the water system for a total length of 20,000 meters and an increase in the amount of water supplied to the area at 30,000 cubic meters per year | Internal water network | Increase the amount of potable water in service areas, increase coverage, especially in high areas, and reduce waste | 16,700 | 1,500,000$ | ANERA | | 2018-2019 | completed |
constructing a rainwater drain channel for the village of Jabaa | constructing channels for rainwater drainage and protecting the area from flooding. The cost of the project | | The project aims at draining rainwater in a safe channel that guarantees public safety for the citizens and their personal properties in the village | Jabaa | $501,555 | ANERA | 100% | 8/2/2017-15/10/2017 | completed |
Rehabilitation of water network for the pumping station of Dar Salah Village | installing a pump and constructing 3 and 4-inch diameter distribution lines as well as installing house connections for the customers in the area | Internal water network | The project aims at getting water to the high areas in the village | Bethlehem | $144,555 | PWA | 100% | 22/5/2017-2017 | completed |
rehabilitation of the well for the use by the Presidential Guards - Jericho | rehabilitation of well | Rehabilitation of wells | The project aims at increasing quantity of water for use by the Presidential Guards in Jericho | | $70,226 | budget of PWA | 100% | 11/8/2016-6/2/2017 | completed |
Construction of water networks for the villages of Khillet Al Mayyeh - Yatta | construction of water networks | Internal water network | improving water supply and distribution for the villages of Khillet Al Mayyeh in Yatta | villages of Khillet Al Mayyeh in Yatta | $862,814 | ANERA | 100% | 26/6/2014-28/1/2015 | completed |
Construction of ground-water reservoir and the rehabilitation of part of Attil’s water network | constructiom of water reservoir with a capacity of 1000 cubic meters and the rehabilitation of part of the water network in the area. | Tanks | increasing the quantity of potable water and reducing the water loss in Attil | Attil | 1,009,081$ | USAID | 100% | 18/5/2014-12/2/2015 | completed |
Construction of water reservoir and rehabilitation of the internal water network of Bil’in village | constructing a reservoir with a capacity of 5000 cubic meters and rehabilitating the internal water network in the village | Internal water network | increasing the quantity of potable water and reducing water loss in Bil’in Village | Bil’in Village | 1,134,011$ | ANERA | 100% | 12/5/2014-7/4/2015 | completed |
Tubas Water Well and Pumping Station | Water Project | | The project aimed at providing residents in Tubas Governorate with good quality and quantity of potable water | | 2,085,863$ | AFD | 100% | 27/10/2010-30/11/2016 | completed |
Construction of sewage network for the Bani Amer area in Rafah | The project includes the extension of the sewage pipes of different diameters, in addition, to delivering new network and home links close wells absorbency | sanitation | The project aims to connect the target area to the sewage network and the septic tanks, which the population depend on to dispose of wastewater, which often swamp and cause environmental problems. | Rafah | 158,000$ | UNICEF | 100% | 12/07/2015-21/03/2016 | completed |
Establishment of pumping station in Al-Amal neighborhood and pressure line in Khan Younis | The project includes the construction of a 3700 -meter cubic meters rainwater plant for emergencies to pump surplus water in the Amal basin to another basin to prevent rainwater flooding in the surrounding area. | sanitation | Establishing an excess rainwater pumping station from AL-Amal nomination basin to another basin | Khan Yunis 50,000 | 576,975 $ | Islamic Bank | 100% | 01/07/2015-01/08/2016 | completed |
Improvement of water supply system for villages West of Bethlehem. | | Integrated water project | | | USD3650000 | WORLD BANK | 100% | 27/04/2017 | under warranty |
water drainage project at Aida Refugee Camp | Constructing of a 200-m long and 1000mm sewer water line and a 200mm-diameter sanitation line | sanitation | The project aimed at improving rainwater drainage services inside the refugee camp and the nearby area, protecting it from rainwater flooding particularly in view of the absence of house cisterns or reservoirs to collect rainwater | Aida Refugee Camp | $63,660 | PWA | 100% | 4/10/2017-26/12/2017 | completed |
connecting Al Awda neighborhood at Al Arroub Refugee Camp to the wastewater network | Constructing of a 250 mm-diameter and 300m-long sewer line | sanitation | The project aimed at improving sanitation services at Al Arroub Refugee Camp in addition to improve the environmental health and the overall landscape in the area | | $59,135 | PWA | 100% | 19/9/2017-29/11/2017 | completed |
Extension of conveyor lines in Al-Fawwar | Extension of a conveyor line with a total length of 910 m in the area of ??Al-Fawwar camp | A main water line | Increasing water supply and reducing loss | 9000people | 69,600$ | Italian Agency for Development Cooperation AICS through GVC | 100% | 15/1/2018-15/3/2018 | completed |
Establishment and rehabilitation of water network in Yatta | Rehabilitation of the old network and construction of a new network (main transmission lines of 18 km length and distribution lines of 45 km length) and construction of a 5000 m3 tank in Beit Umra | Internal water network | Connecting homes to the water network, developing the water system, and improving the supply service in the area. | 84,911 | 17,760,510$ | USAID | | 2017_??? ??????? ???? ????? ??? ???? ?????? ?? ??????? ????????? ??? ????? ????? ?? ???? ???????? ??????? ?? ????? | under implementaion |
Building a reservoir and constructing a water network in Dura | Extension of transmission lines with a total length of 1.5 km and distribution lines with a total length of 4.4 km and the construction of a ground reservoir with a capacity of 2000 m3 in Dura | Integrated water project | Improving water supplies through the development of the water supply and distribution system in Dura | 27455people | 4,165,658 $ | USAID | 100% | 17/9/2017-17/9/2018 | completed |
Construction of a reservoir and construction of a water network in Karma | ? Extension of conveyor lines with a total length of 300 m distribution lines with a total length of 8 km ? Construction of a 500 m3 high tank ? Extension of about 6 km, home connections ? Installation of 370 prepaid meters in al-Karma . | Integrated water project | Connecting homes to the water system by establishing a water system and providing safe water supplies | 1819people | 2,693,673$ | USAID | 100% | 2/9/2017-2/9/2018 | completed |
Rehabilitation and expansion of water network in Al-Shuyukh area | Rehabilitation of the network with a total length of 16,000 m, including an expansion of the network by 11,000 m, rehabilitation of the network by 5,000 m, maintenance of the pumping station and replacement of pumps | Internal water network | Increasing the quantity of potable water and distributing it equitably, and connecting all homes in the Shuyukh area to the water network | 11,280 | $ 1,300,000 | USAID | | 3/7/2017-29/4/2019 | under implementaion |
Building fence and road of Al Ouja water well | building a fence and a gate to the well in addition to paving the entrance | | The project aims at protecting the well and increasing quantity of potable water | Auja 5200 inhabitant | $119,396 | PWA | 100% | 10/8/2017 | completed |
Construction of a water tank and rehabilitating the internal water network in Deir Al-Ghosoun Municipality | Construction of transmission lines and distribution lines with a total length of 12 km with different diameters Building a 500 m3 high tank and 25 manholes equipped with all mechanical parts and establishing a pumping station in the area | Tanks | Reducing the loss rate and increasing the amount of safe drinking water, ensuring quality and equitable distribution | 3880people | 1,057,772$ | PWA | 100% | 2017-2018 | completed |
Construction of an internal water distribution network for the municipality of Araba | Rehabilitation of the internal network of the municipality of Arraba, extension of water lines of various diameters with a length of 21 km, construction of manholes that ensure the distribution of water in the required manner, in addition to the construction of small payment stations to deliver water to higher areas | Internal water network | Increase water quantities, reduce loss, ensure water availability and equitable water distribution | 9864people | 1,012,684$ | PWA | 100% | 2017-2018 | completed |
construction of a water network in Al Hadeediyyeh and Khillet Saleh | rehabilitation of the internal water network in Al Hadeediyyeh and Khillet Saleh area | Internal water network | improving the water supply service by connecting unserved communities and delivering water to the houses as well as water distribution in Al Hadeediyyeh and Khillet Saleh area in Yatta | Al-Hadediya and Khallet Saleh | $1,273,281 | ANERA | 100% | 8/10/2015-10/4/2016 | completed |
(Kafr Ein Water Network (phase III | Internal water network | Internal water network | Decrease waste and increase the amount of drinking water and improve the distribution process | Kafr Ein | 874,100 NIS | PWA | 100% | 28/8/2017-13/3/2018 | under warranty |
Supplying water pumps to Jenin Refugee Camp, Ktaba, Azzoun, and Bir Abu Arab | supplying water pumps to Jenin Refugee Camp, Ktaba, Bir Abu Arab | | The project aims at increasing quantities of potable water and improving quality and reliability of water supply services and ensuring fairness in distribution | 65,000 Jenin camp, Ketaba,Jenin | $78,953 | PWA | 100% | 21/7/2016-31/05/2017 | completed |
Supply water pipes of different sizes, spare parts, and valves | Supply of pipes | Water line | The project aims at decreasing rates of water loss by providing local councils with different sizes of pipelines, high quality water, and improving the networks performance by maintaining transmission pipline and internal networks for the various areas in the West Bank | West Bank | $1,721,062 | PWA | 100% | 16/8/2016-25/1/2017 | completed |
Construction of conveyor lines in the Municipality of west Bani Zaid | Transmission line diameter 6 and distribution lines diameter 3 * 2 | Water line | Decrease waste and increase the amount of drinking water and improve the distribution process | BANI ZAID | NIS1,829,348.5 | PWA | 100% | 24/1/2017-30/9/2017 | under warranty |
Construction of pumping station and conveyor line for Beni Zeid first phase tank | Pump and conveyor lines with diameters 8 * 6 | Water desalination plant | Decrease waste and increase the amount of drinking water and improve the distribution process | West Bani Zaid | NIS871,834 | PWA | 90% | 20/9/2016-15/04/2018 | under implementaion |
Project for the recovery and reuse of treated water in the irrigated agricultural land / the first stage. | The implementation of 14 recovery wells and a circular concrete tank with a capacity of 4000 m3 and the construction of the pump building and the installation of 5 pumps of 750 m3 / y for one pump to pump water from the reservoir irrigation network and construction of electricity and control and extension of assembly lines and water transfer from wells to the reservoir in addition to the establishment of 5 control wells. | | The primary goal is to avoid the potential impact on the long-term underground reservoir and ensure the safety, health and environmental protection and utilization of treated water to irrigate 5000 acres within the first stage which will reach 15000 acres after the implementation phase which in turn leads to the development of agriculture in the area. | Jabalia al-Nazlah - Beit Lahia - Beit Hanoun and Umm al-Nasser | 10,970,996.4$ | WORLD BANK | 37% | 19/10/2016-19/4/2018 | under implementaion |
Completion of the remaining works for the construction of the treatment plant for North Gaza | | sanitation | Avoid environmental disasters that may occur in old Beit Lahia station in Umm Al-Nasr due to random ponds where high population density. Wastewater treatment of northern Gaza Strip and nominated to the underground reservoir through the filtration basins | Jabalia 350,000 inhabitants | 6,236,584.00$ | WB&AFD | 100% | 1/3/2017-28/2/2018 | |
Rehabilitation of an internal water network for Battir village | Rehabilitation of the water network in the village with lines of (4) inches with a length of 1.2 km, (3) inches with a length of 2 km, and (2) inches with a length of 20 km, including 1000 household connections | Internal water network | The project aims to improve the water supply service in the region by replacing old and worn-out networks with new networks of appropriate diameters to ensure that citizens are provided with sufficient quantities of water.. | 6,000 | $ 1,101,829 | PWA | | 2018-2020 | completed |
Rehabilitation of the water network of Qafin village | Supplying and installing water pipes of different diameters with a total length of 18 km and 1000 household connections | Internal water network | Improving the water distribution system in the region, expanding the service to include participants who do not have access to water supply, providing quality water, reducing loss and improving collection efficiency | 4800people | 839,609$ | PWA | 100% | 2017/09/05-2018/09/04 | completed |
Wastewater project for Nour Shams Refugee Camp | constructing a 350 mm diameter-sewer line that is 250m long | sanitation | The project aims at improving sanitation services at Nour Shams Refugee Camp and the nearby area, in addition to improving the general landscape and provide a healthy environment for the residents | Nour Shams Refugee Camp | $61,273 | PWA | 100% | 19/9/2017-31/12/2017 | completed |
Financing feasibility study -water project -yamun1042 CPS | water | | Design and supervision | Al-yamun 70000 people | 1000000Euros | AFD | 70% | 22/10/2018-1Oct-2014 | Under implementation |
| | | | | | | | | |
The establishment of the central desalination plant in the Gaza Strip with a total capacity of 55 million cubic meters annually | The establishment of the central desalination plant in the Gaza Strip with a total capacity of 55 million cubic meters per year and the construction of a solar power plant with a total capacity of 12.5 MW. | | Improve the quality and quantity of water supplied to the population in the Gaza Strip. | All residents of the Gaza Strip (1.8 million) | Design: $2.4 million . construction: $330 million | | | | |
The dessert station expansion limited quantity for the southern region (final energy 7.3 million cubic meters annualy | Expansion of reverse osmosis plant | | Improve the quality and quantity of water supplied to the population in certain neighborhoods in Rafah and Khan Younis. | About 250 thousand in southern region (Rafah and Khan Younis) | Funding: 20 Million Euros | | | | |
Establishment of desalination plant limited quantity for the southern region (2 million cubic meters annually). | Construction of Reverse osmosis plant and transmission line of desalinated water. | | Improve the quality and quantity of water supplied to the population in certain neighborhoods in Rafah and Khan Yunis. | About 75000 people in Rafah and Khan Yunis | Funding: 10 Million Euros | | | | |
Construction of 4 tanks and associated pumping stations II | Constructing of 4 total size tanks 15300 cubic meters and the establishment of 4 pumping stations (one per tank) and create a 10.2 km water networks | Integrated water project | Improve the quality and quantity of water supplied to the population in Maghazi ,Bureij , Deir El-Balah and Rafah. | About 171300 people in targeted areas | Construction: $17,179,000 | USAID | 45% | 12/2016-8/2018 | Under implementation |
Construction of 4 tanks and associated pumping stations | The construction of 4 tanks of 3800 cubic meters for each, the construction of 4 pumping stations (one for each tank) and the construction of 6.35 km water networks. | Integrated water project | Improving the quality and quantity of water provided to residents in Beit Lahia, Nusseirat, Deir El Balah and Khan Younis. | About 297950 people in targeted areas | Construction: $17,667,222.63 | | | | |
Expansion of the sea water desalination plant in Deir al-Balah | Construction of a sea water desalination plant in Deir al-Balah with a production capacity of 3400 cubic meters | | Providing the central region with the appropriate consumable water in terms of quantity and quality, in addition to raising the production capacity of the Deir al-Balah desalination plant from 2,600 cups/day to 6000 cups/day. | 90,000 | $17,335,000 | USAID | | 11/2016-4/2019 | completed |
Construction of desalination plant limited to the quantity of Gaza City (3.7 million cubic meters annually). | Construction of reverse osmosis plant and mixing tank (5000 cubic meters) and a line of desalinated water from the station to the tank). | | Improve the quality and quantity of water supplied to the population in some neighborhoods of Gaza City. | 125,000 inhabitants of the targeted neighborhoods | Funding: $15 million | | | | |
Maintenance of the Mekorort supply line for Gaza City | Maintenance of the Mekorot supply line to Gaza city by changing and adding some of the fittings. | | Improve the quality and quantity of water supplied to the population in Gaza City. | All residents of Gaza City | $ 64,850 | | | | |
The central processing plant for Gaza and related business and Central (Gaza Valley pumping station and conveyor lines and a power station. | The central processing plant for Gaza and related business and Central (Gaza Valley pumping station and conveyor lines and a power station. | | Protecting groundwater from extinction and achieving food security | About 5000 dunums of farmland | 8.217million dollars | | | | |
Construction of Khanunis Central Processing Station Processing Card: 26,600 cubic meters per day. | Construction of the central processing plant for Khan Younis area and related works (conveyor lines and filter basins). | | Improving environmental and health conditions of the Palestinian population in the southern provinces of the country and non-traditional sources of water supply for agricultural use and create new jobs for the population there. | 217,000people | 57,830,000$ | Japanese Government and Kuwait Development Fund through UNDP | | 2015-2020 | under implementaion |
Northern project (NGEST)-phase 1-the first partial (13000 m3 per day). | Construction of 6 wells to restore and build a reservoir and construction of wells - reservoirs and the construction of pumping station | Integrated water project | Protecting water sources from pollution in the coastal basin and utilization of treated water in the agricultural sector and create new jobs for the population in the southern provinces and the reduction of unemployment | About 5000 dunums farmland | 8.217million dollars | | | | |
Mawasi Khanyouns project (3000 m3 / day) | Constructing 5 sand filters, collecting basin, pumping station and conveyor lines. | Integrated water project | Protecting water sources from pollution in the coastal basin and utilization of treated water in the agricultural sector and create new jobs for the population in the southern provinces and the reduction of unemployment | About 600 dunums of farmland | 600000$ | | | | |
| | | | | | | | | |
Bani Zaid sanitation project | Transmission line | sanitation | Sewer line | BANI ZAID | 64,715Euros | Austrian | 100% | 31/5/2014-30/9/2015 | completed |
Main water line project in Reef Dora | Water network | Water line | Water network | Reef Dora | 413,250 شيقل | Unicef | 100% | 16/6/2015-16/9/2015 | completed |
The project to create the recovery and wells to pump treated water for agricultural irrigation | Wells, reservoirs, pumps, and irrigation | sanitation | Avoid potential wastewater impact long term groundwater pollution in surrounding areas. Implementation of the measures and actions necessary to mitigate the environmental and social health of communities adjacent to the project area as well as to maintain agricultural crops. The underground reservoir water conservation and provide an alternative water source for irrigation of agricultural land 15000 acres. | East of Gaza City and Jabaliya | 10.9million$ | WORLD BANK | 30% | 1/9/2016-31/3/2018 | Under implementation |
Technical assistance project for the Gaza Strip water supply program | | | | Gaza | | | | | |
Contract for the establishment of a treatment plant in northern Gaza (NGEST) Phase II | Sanitation | sanitation | Improving sanitation in the northern Gaza Strip and avoid environmental and social risks for the population surrounding the old treatment plant in Beit Lahiya due to random and non ponds pollute underground tank there | Citizens and institutions | 58,000,000$ | World Bank, AFD, EU, the Swedish development agency, Belgium | 95% | 03/09/2010-10/01/2014 | stuck |
Construction and rehabilitation of a water pipeline from the well of Beteba in Nablus to Sanur well in Jenin | 12 water transmission line length of 16 km, as well as other conveyor lines to link with diameters ranging from 10 to 4 in total length 3350 meters | Water line | Increase the amount of safe drinking water in areas of service and linking water sources | Silat Aldaher , fandaqumiya, Borqa, Bazaria, Nablus, Bethlehem, Alasaasah | 6,859,034$ | United States Agency for Development | 100% | 12/3/2013-19/3/2015 | completed |
constructing a sewage line in the National Security Forces Camp in Salfit | Constructing a 350mm diameter-sanitation line that is 1.6 km long | sanitation | The project aims at improving the general landscape, getting rid of the cesspit at the camp and preventing wastewater flooding to surrounding areas | National Security Camp | $119,939 | PWA | 100% | 2/8/2016-2/2/2017 | completed |
The water authority capacity building project | Building capacity | | | | 6,400,000$ | -WORLD BANK-Multi Donor Trust Fund | 50% | 8/1/2011-31/12/2017 | Under implementation |
Water supply project consulting services to the Tubas area tayaseer and Aqaba | Design and construction supervision | Internal water network | تصميم واشراف | Tubas, tayasir,Aqaba 50,000 people | 155,247Euros | AFD | 50% | 1/4/2016-1/2/2017 | Under implementation |
(Jaba-Noba (phase II | Pumping stations created tanker lines and distribution in Sureif , kharas | Water desalination plant | Increasing the amount of potable water, linking water sources, covering upland areas, and developing the supplied and distributed water system in service areas | Surif, kharas, Nuba, Beit Awla ,the Western countryside and Tarqumiya (indirectly) | 7,703,965$ | USAID | 100% | 15/11/2016-10/3/2018 | completed |
Project to improve water services in Al-Yamoun area CPS1042 | Rehabilitation and extension of water networks | Internal water network | Rehabilitation and extension of water networks | Villages of Yamoun and part of northern West Bank,70, 000 people | 8,000,000Euros | AFD | 33% | 22/10/2018-22/10/2016 | Under implementation |
Project development of safe access to treated water to be used by farmers by developing human resources in wastewater treatment plants | Training of water sector rehabilitation of sewage plant operators through accredited business certification | | Rehabilitation of the licensed service operators in the sanitation sector and ensure the quality of water used in farming and processing water which in turn will raise the irrigated area | All provinces homeland | 200,000Euros | The Spanish Government | 50% | 2014-2016 | Under implementation |
(Bani Zaid + Kafr Ein (A main water line+Network | A water pipeline and pump station and internal network | Integrated water project | A water pipeline and pump station and internal network | West Bani Zaid | 3,500,000NIS | PWA | | | |
Raise the efficiency of water sector workers | Training of personnel in the water sector through training in specialized areas related to improve the skills of workers in the water and sanitation sector | | A training program for water and sanitation service providers to develop their abilities, knowledge and skills of workers in this sector as well as to support the exchange of experiences in the field of sustainable management of sanitation infrastructure and choose the best solution for providing and managing services | All provinces homeland | 200,000Euros | The Spanish Government | 100% | 3/1/2013-2015 | completed |
Project to replace Al Reheyya line | constructing a 4-inch transmission pipline that is 1km long | Water line | The project aims at increasing quantity of potable water and reducing water loss | Hebron 5300 inhabitants | $60,126 | PWA | 100% | 16/10/2016- 04/06/2017 | completed |
Building a water tank and lines to Bartaa village | High tank capacity of 500 cubic meters and bus line 6 | Tanks | Increasing amounts of drinking water | Bartaa 5000 people | NIS 1,563,350 | PWA | 85% | 29/9/2016- 31/4/2018 | under implementaion |
Development of a Master plan for water and sanitation projects in North-West of the West Bank. | Master plan for water and sanitation | | The aim of the plan is to develop the water and sanitation sector | West Bank | Euros 612,000 | AFD+KFW | 100% | ???? 2015-????? ???? 2017 | completed |
Water supply and sanitation program in the Palestinian territories (Aqraba equipment) | Supply of equipment | | Supply of equipment and tools for operation and maintenance of the water system | Aqraba 40,000 residents | 430,000Euros | KFW | 99% | 31/3/2017-5/2/2014 | Under implementation |
First phase of SCADA project - Monitoring and central remote-control system | installation of a water-flow monitoring system in 47 wells that are spread out in different locations in the West Bank | Water line | building an integrated monitoring system that covers the whole of the West Bank area | West Bank | 4,950,980$ | USAID | 100% | 20/5/2015-14/5/2013 | completed |
Completion of the design work associated with the central desalination plant in Gaza Strip | Design and preparation of tender documents for the 42 km long conveyor line plus lifting and mixing tanks and pumps also networks. | Tanks | Improving water supply for the population of the Gaza Strip | 2,00,000people | 2,400,000$ | WORLD BANK | 100% | 30/4/2018-13/2/2016 | completed |
constructing a main water pipeline for Aqqabba - Tubas | construction of transmission pipline with a length of 3,266 meter and 8 inches diameter from Aqqabba pumping station to Aqqabba reservoir as well as constructing five manholes in the region. | Water line | The project aims at improving water supplies to the residents in Aqqaba by reducing water loss and increasing quantity of potable water | 9,000 Aqqabba | $280,574 | PWA | 100% | 15/3/2017-18/7/2016 | completed |
The reform and restructuring of the water sector | Sanitation | sanitation | | West Bank | 5,000,000$ | WORLD BANK | 70% | 8/1/2011 | Under implementation |
Completion of the sewage line of Jaffna Ain Sinya | Sanitation | sanitation | Sewer line | Jaffna, Ein Sinya 1500 people | 1,590,928NIS | PWA | 100% | 14/8/2016-14/2/2016 | |
Wastewatr network rehabilitation project in Artas | Sanitation | sanitation | Rehabilitation of the sewerage network | 6,000 | 312,969Euros | PWA | 100% | 30/3/2014-30/3/2016 | completed |
Water supply and sanitation program in the Palestinian territories (Aqraba counters) | Counters | | Supply and installation of 7000 counter with its own operating system | Aqraba 42,000 people | 992,877Euros | KFW | 100% | 2/4/2016-23/3/2014 | completed |
advisory services for the development and rehabilitation of water supply and Sewerage Authority Bethlehem | Rehabilitation | Rehabilitation of wells | Design and construction supervision | Bethlehem, Beit Jala, Beit Sahur 5200 people | 1,622,081Euros | AFD | 96% | 31/12/2017-03/03/2012 | under implementaion |
Water supply and sanitation program in the Palestinian territories (Habla) | | Internal water network | Water supply and sanitation | Habla 6500 people | 597,929Euros | KFW | 100% | 21/8/2014-21/10/2013 | completed |
Water supply and sanitation program in the Palestinian territories (supplying cars perfusion for maintenance of sanitation networks) | Supply of equipment | sanitation | Supplying cars perfusion for operation and maintenance of sewage systems | Coast water privilege groupings | 630000Euros | KFW | 98% | 18/3/2014 - 31/03/2017 | Under implementation |
Water supply project for the Tubas area , Tayaseer and Aqaba | water | Internal water network | Water supply for the Tubas area Tayaseer and Aqaba | Tubas , Tayaseer and Aqaba | 2766175Euros | AFD | 84% | 01/04/2016 - 01/02/2016 | Under implementation |
The establishment of Sewage networks at the Alberka area in Deir al-Balah and link those networks with pumping station in the pond | Extension of the sewage lines 15 kilometers in Alberka area and the work khromianik in the pond pump | sanitation | Contribute to the improvement of the living conditions and the protection of water resources, and improving health conditions in the project area and get rid of health hardships caused by sewage rash of rooms in the area of sink | Alberka area in Deir al-Balah | 1,257,000Euros | EU through KFW | 70% | 05/09/2016 – 6-10-2017 | Under implementation |
constructing a water reservoir in Seer village | constructing a reservoir with a capacity of 500 cubic meters | Tanks | The project aims at improving water supply services and ensure fair in distribution | Seer | $343,100 | PWA | 100% | 14/8/2016 - 27/9/2017 | completed |
constructing part of the internal water distribution network for Azzoun Atma village | supplying and installing water pipes of different sizes with a total length of 6.0 kms long. | Internal water network | The project aims at rehabilitating the water network for the village to improve water supply services in addition to reducing water loss and enhancing efficiency of the collection of fees | Azzoun -Atma 2200 people | 867.352 NIS | PWA | 100% | 14/8/2016 - 31/8/2017 | completed |
Sewage networks in the region of Amer | Sanitation | sanitation | Contribute to the improvement of the living conditions and the protection of water resources, and improving health conditions in the project area and get rid of health hardships caused by sewage rash of rooms in the area of sink | North and west of Jabalya ,Nazlah and west of Beit Lahia | 1231055Euros | EU through KFW | 75% | 05/09/2016 - 06/10/2017 | Under implementation |
Construction of water distribution and links to Household Iraq Burin Network | Water network 14 km diameter of 100 mm and 20 mm - links household number 280 - with pre- payment counters | Internal water network | Water supply for the village | Iraq Burin 1200 inhabitants | 668,129Euros | PWA | 100% | 23/3/2016- 23/2/2017 | completed |
Sewerage project Artas - Bethlehem | Completion of the internal networks - the establishment of a sewage line in Artas | sanitation | Protection of the environment and the population of wastewater | Artas area | 312.969Euro | PWA | 100% | 2013- 2015 | |
Wastewater project in Kafr ad Dik / Salfit | Transmission line to carry water from Bruqin area until the end of Kafr ad Dik area | sanitation | Protection of the environment and the population of wastewater | Kafr ad Dik | 1,525,595NIS | PWA | 100% | 23/7/2016-23/11/2015 | completed |
The establishment of a sewage network in Habla | Sewage network | sanitation | Improving sanitation services | Habla 7308 inhabitants | 1.5million dolars 0.7million dollars | Japan USAID | 100% | 2/2015 | completed |
Water system project in jinsafut/Qalqilya | construction of 500 cubic meter- reservoir and rehabilitating the existing water network. | Integrated water project | increasing the quantity of potable water and reducing water loss in Jinsafout | Jinsafut 2574 inhabitatans | $645,730 | ANERA | 100% | 20/10/2014-2/8/2015 | completed |
Construction of water reservoir in Falamya village - Qalqilya | constructing water reservoir with a capacity of 200 cubic meters | Tanks | increasing the quantity of potable water in Falamya | Flamia 769 inhabitants | 212,981 $ | ANERA | 100% | 14/4/2015 - 4/11/2015 | completed |
Bruqin village sewer line project | The establishment of sewer line | sanitation | Move the waste water coming from the settlement of Ariel, Salfit from inside the village | Bruqin 4,500 inhabitants | 1,798,775NIS | PWA | 100% | 12/3/2013 - 6/3/2014 | completed |
Bedia rehabilitation treatment plant | Bidya treatment plant rehabilitation and reuse system | | Protect populations from wastewater | Bedia 9574 inhabitants | 100000$ | Austria | 100% | 5/2013 - 1/2014 | completed |
Rehabilitation of Bidya water reservoir | rehabilitation of a reservoir with a capacity of 500 cubic meters | Tanks | Improving the potable water for the population | Bidya 8,500 inhabitants | $23,278 | PWA | 100% | 25/11/2015-25/8/2015 | completed |
Salfit sanitation project | Create a treatment plant for the town of Salfit capacity of 2000 m3 per day | sanitation | Protect populations from wastewater | Salfit 10443 inhabitants | 8million Euros | KFW | 10% | 10/2015 - 10/2018 | The tender was submitted |
Rehabilitation of Auja well | Construction of the reservoir and pumping station and carrier line | Rehabilitation of wells | supplying water to Auja | Auja area | 820,300$ | JICA | 100% | 2016_2018 | completed |
Dig Nawaiamah Well | Digging water well its capacity will be 150 m3/s | Digging wells | Water deficit | Jericho ,Nawaiamah | 397,500$ | PWA | 100% | 22/3/2016- 22/3/2016 | completed |
Beit Dajan village sanitation project | Sewerage network and treatment plant and water reuse treatment system | sanitation | Improve the environmental situation and provide water for agriculture. | Beit Dajan 4138 inhabitatans | 1.5million euros | EU | 100% | 1/2013 - 1/2015 | completed |
Surra village sanitation project | Sewerage network and treatment plant and water reuse treatment system | sanitation | Improve the environmental situation and provide water for agriculture. | surra 3042 inhabitatans | 2million euros | EU | 100% | 1/2013 - 3/2015 | completed |
Tammuns water network project | Create an internal water network in tammun | Internal water network | Improve the water situation in Tammun | Tammun 20,000 inhabitants | Euros 2,891,840 | AFD | 100% | 15/11/2014-4/10/2013 | completed |
Wastewater project for villages east of Nablus | Establish a treatment plant, Wastewater network for six villages, Transmission pipeline ,and rehabilitation of water networks. | sanitation | Improve wastewater services for villages east of Nablus and reuse treated water in agriculture | 200,000 | 54,520,000$ | KFW ,PWA | | 2017-2025 | under implementaion |
Sewage network project in Qusin and Beit Wazan | Sanitation and re-use and building the capacity of the system networks and a pilot project for re-use | sanitation | Improving sanitation services | Qusin, Beit Wazan 3284 inhabitants | 1.7million Euros1.2Euros | KFW USAID | 10% | | under implementaion |
Water supply and sanitation program in the Palestinian territories | Aqraba village water supply lines project , pump station , tank | Integrated water project | Supplying water to the villages of Aqraba | (Aqraba villages (12 | 11.144.353 EURO | KFW | 100% | 23/9/2012 -3/9/2016 | completed |
Two boreholes drilling project in kvirit, janzour | Digging artesian wells | Digging wells | Increase the amount of drinking water to the area | Northern communities | 1,302,600$ | PWA | 100%kevirit | 1/11/2013-9/11/2011 | completed |
Rehabilitation Jenins treatment plant | Rehabilitation treatment plant | sanitation | Water reuse in agriculture and stopping its flow into the green line and stop the Israeli assessment | Jenin and Jenin refugee camp | 2million Euros | Germany | 100% | 2011 الى 2012 | completed |
Anza village sanitation project | Sewerage network and treatment plant and water reuse treatment system | sanitation | Improve sanitation and environmental protection and the provision of water, non-traditional sources for irrigation | Anza 2272 inhabitants | 1.5million Euros | The European Union | 100% | 2010-2014 | completed |
Wastewater project for Bartaa Al Sharqiah | Construction of sewage network and home connections | sanitation | Improving sanitation services and environmental protection | Bartaa 5065 inhabitants | 0.65million dollar 150000 dollar | Japan Germany | 100% | 2012-2014 | completed |
Wastewater project for of Mislyyeh and Al-Jarba | Establish a wastewater network(18km long). Establish a treatment plant(wet land system) with a capacity of 450 cubic meters/day. Install more than 450 households connection, an environmental awareness-raising program, reuse of treated wastewater on a pilot basis,solar panels.f | sanitation | Improve sanitation services in the village of Mislyya by establishing an integrated wastewater system in the village | 3000people and 20 farmers | 6,132,500$ | AFD | 100% | 11/2016-10/2018 | completed |
Al-Yamoun and nearby villages water project | Rehabilitation and extension of internal networks along 90 kilometers create 3 water tanks into a tanker kvirt processing and pumping station rehabilitation and linking subscribers counters overrun by cicadas system | Integrated water project | Improving water supply and increase the amount of water supplied for communities | Alyamoun,Al-seela alhartheiah,Romanah, Ataibaa, Aneen, Kofradaan, koforkood, Taanak, Alhashmeiah, Alaraqa, Zboba, kherbat alsaadah, kharab rooj | 7.246.802million Euros | United States Agency for Development | 10% | 3/11/2014 | Under implementation |
Rehabilitation of wells in Jenin | fully rehabilitating Araba and Sanour wells, building a balancing reservoir, a centrifugal pump unit in Araba and Sanour areas in addition to the cleaning of Al Sa’adaa well in Jenin. | Rehabilitation of wells | increasing water supply rates in un-served areas and decrease discrepancies in supply rate | Arabaa, Sanoor,Jabaa, Anza,Fahma, Ber-Albasha,Hai-ALshohadaa, =70000inhabitants | 14,721,856.00$ | United States Agency for Development | 100% | 23/10/2013 – 24/10/2015 | completed |
Northeast of Jenin water project-phase I | constructing 6-16 inch diameter pipes with 24 kms long-transmission piplines to the villages of North-East Jenin as a first phase as well as building the Faqou’aa pumping station | Water line | increasing water supply coverage for unserved areas | Deir Ghazaleh, faqqua, Arbona , arrana, Beit qed, jalbun, Wadi-Aldabi , Deir Abu daif = 20603 inhabitants | 11,045,000$ | USAD | 100% | 2/2/2015 - 17/8/2016 | completed |
Rehabilitation of Qabatya wells with conveyor line | Rehabilitating a well , building a balance tank , supply a pump and unit to push in addition to conveyor line 10 diameter | Rehabilitation of wells | The project aims at increasing quantity of potable water in service areas and decreasing discrepancies in daily supply per person | Alzababdah, Qabatia, Jalqamos, Omaltoot, Almghair=40000inhabitants | 7,708,760,00$ | United States Agency for Development | 100% | 14/5/2013 – 3/2/2016 | completed |
Establishing a treatment plant for the industrial zone | Establishing a treatment plant | | Improving sanitation | The Industrial Estates Authority in Bethlehem | 492.000Euros | AFD | 100% | 2012 - 2016 | completed |
replace Nahaleen water transmission pipline | construction of transmission pipline between 4-12 inches diameter and 11 kms long | Water line | increasing quantity of potable water to service areas and reducing water loss in Bethlehem areas-Nahaleen, Hussan, Battir, and Wadi Fokeen | Nahalin,Husan,Wadi fukin,Bter 21673 inhabitants | 12,214,885$ | United States Agency for Development | 100% | 11/6/2013- 19/9/2015 | completed |
Create internal networks to the villages of West of Bethlehem/Husan | The establishment of an internal water network 24 km long diameters: 6 ,4,3 ,2,1 with home links and control fountains | Internal water network | Improve the water situation | Husan 6807 inhabitants | 1389087.5$ | WORLD BANK | 100% | 1/2/2015 – 1/10/2015 مع التمديد | completed |
The establishment of an internal water network in Wadi Fukin | The establishment of internal water network length of 7.5 km in diameters: 3 , 2 , 1 , with 350 home links | Internal water network | Improve the water situation | Wadi Fukin 1432 inhabitants | 377405$ | WORLD BANK | 100% | 15/6/2015 – 15/11/2015 | completed |
Bilding up Internal networks in Nahalin | The establishment of internal water network length of 3 km in diameters: 6,4, 3,2, with home links number 1400 | Internal water network | Improving the water situation | Nahalin 8372 inhabitants | 1580000 $ | WORLD BANK | 100% | 1/8/2015 – 1/4/2016 | completed |
Rehabilitation of the internal networks in the region of Bethlehem | Rehabilitation of the internal networks in the region of Bethlehem, Beit Jala and Beit Sahour | Internal water network | Improve the water situation in the region | concession area of Water and Sewerage Authority of Bethlehem | 13.226.335 Euros | AFD | 70% | 14/1/2015-15/12/2017 | under implementaion |
The establishment of Arroub treatment plant | The establishment of processing and operation of the treatment station for a year and water reuse treatment system | sanitation | Wastewater treatment of Arroub and reuse in agriculture | AL-Arroub Refugee,Shoyoh AL-Aroub | 1.2million Euros | Spain | 100% | 2014-2016 | completed |
Rehabilitation of the water line carrier-Dura | 8 diameter water transmission line length of 1100 meters to feed the countryside West of Deir Samit tank | Water line | Increase the amount of safe drinking water in areas of service and reduce waste | Western Rafe Dura 15000 inhabitants | 110,000.00$ | UNICEF | 100% | 6-2015 9/1/2015 | completed |
building and rehabilitate the water transmission pipline from Deir Sha’aar station to Halhoul central reservoir | Installation of Halhoul water network, Re-paving and rehabilitation of 10 kms of roads through which the new main transmission pipline passes through, Maintenance of the main street of Halhoul City | Water line | increasing quantities of potable water and decrease water loss the networks in service areas | Hebron 700000inhabitans | 16,512,214$ | United States Agency for Development | 100% | 6/11/2013- 10/8/2015 | completed |
construction of a water transmission pipline from Halhoul central reservoir to Bani Na’im - First phase | construction of 20- inch wide transmission pipline from Hahoul regional reservoir to service areas. in addition to construction of 6-inch distribution lines of 9kms long | Water line | increasing the quantity of potable water and distributing it fairly in service areas, linking all houses to the water network in the areas of Hebron, Sa’eer, Al Shyoukh, Al Addeiseh, Al Duwwara, and Bani Na’im | Bani Naim, Al-Adaysa, Al-dwara, Ras Al-Taweel, 30,000inhabitants | $4,462,836 | USAID | 100% | 4/11/2014 – 29/10/2015 | completed |
of water reservoir, water network, and water connections for Imneizel_Yatta | Constructing a reservoir with a capacity of 500 cubic meters in addition to households water connections | Tanks | The project aims at improving the water supply and distribution services and linking unserved communities in the village | Imneizel | $510,669 | ANERA | 100% | 6/3/2015-17/7/2017 | completed |
Hebron treatment plant project | The establishment of a processing station and treatment plant for 5 years and treated water reuse system | Water desalination plant | Wastewater treatment and reuse in farming of Hebron and stop the Israeli deduction | Hebron and parts of Halhul | 47million dollars | WB EU AFD USAID | The project began | 11\2015 الى 11\2023 | Preparation of tender documents |
| | | | | | | | | |
| | | | | | | | | |
| | | | | | | | قيد طرح العطاء | |
| | | | | | | | | |
| | | | | | | | | |
Rehabilitation of agricultural wells in Qalqilya governorate (phase I) | Rehabilitation of wells and provision of electrical and mechanical equipment to improve their productivity and operation | Rehabilitation of wells | Rehabilitation of 10 wells in the region | 4000People | 772,738$ | PWA | 100% | 2017-2018 | completed |
Wastewater project in Baqa Al Sharqiyeh and An Nazlat area | Establish wastewater networks (28 km long) and transmission pipeline (4 km long) as well as three pumping station> | sanitation | Improve sanitation services by removing cesspits and cleaning the Abu Nar valley from wastewater | 14,400 | 6,700,000$ | The Dutch government throgh UNDP | | 2014_2020 | completed |
The establishment of a sanitation network in Eastern Baqa | Sewage network | sanitation | Improving sanitation | Eastern Baqa | 2million dollars | Japan | 100% | Apr-15 | completed |
Wadi Zomar Project | Clean the valley from wastewater and protect water resources in the western aquifer. Establishment of sewer lines (17 km long and 400_800 mm diameter), and more than 80 km of wastewater networks and house connections in eight communities | sanitation | Protect the environment against wastewater and improve sanitation services in Wadi Zomar | 108,000 | 21,185,000$ | The German government through KFW | 100% | 2012-2019 | completed |
Construction of the conveyor line and pumping station for the village of Saffarin | A main conveyor line with a diameter of 6 inches and a length of 8 km, in addition to a pumping station with a capacity of 70 m3/h and a 100 m3 balance tank. | | Increasing the quantities of water supplied to the residents of the villages of Safarin and Shufa | 3000 | 1,205,969$ | PWA | | 1/2/2012 – 1/11/2019 | completed |
South-West Jenin Water Project | constructing six new reservoirs, establishing a pumping station, and a water network that is 17,365 meters long. in addition to installing a 3-km long Transmission pipline that connects Sanour and Maythaloun stations. | Integrated water project | The project aims at increasing quantity of water supplied to the residents, ensure fair distribution in the South- Western part of the Jenin Governorate | Araba, Ajja, Kfaret,Koforaai, jalqamos,Almoghair, Aumaltoot, Almoteela =37,836 people | 12,949,433 $ | USAID | 100 % | 26/10/2015- 4/6/2017 | completed |
Halhul water network project in collaboration with hydrology | Rehabilitation of the internal network | Internal water network | Improving the status of drinking water for the population | Halhoul | 1,624,000NIS | UNICEF | 100% | 2015 | completed |
Construction of internal water network in Al Karmel - Yatta | rehabilitating the internal water network in the area | Internal water network | improving the water supply and distribution services and link unserved communities | Carmel 3700 inhabitants | $1,676,639 | ANERA | 100% | 4/2/2015-6/5/2016 | completed |
Jericho sewage network expansion | Expansion of the network and home links | sanitation | Improve the sewerage network | Jericho 22000 inhabitants | 5Million Dollar | USAID | 100% | 12\2014 الى 11\2015 | completed |
Building a road and a fence around Jericho’s Wastewater Treatment Plant. | building a fence and the road leading to the plant to facilitate operation and maintenance works. | sanitation | Protect the treatment plant | Jerich 22000inhabitants | $819,354 | PWA | 100% | 24/5/2015-14/4/2016 | completed |
Construction of the tank and pumping station in Tubas | ,Pump station,Balance tank rehabilitation of a well and pump with Tubas disciples for the location of the well. | Water pumping station | Increase the amount of drinking water for Tubas | Tammun ,Tubas,Tayaser | 1,600,000Euros | AFD | 100% | 2011-2015 | completed |
Construction of a wastewater purification plant with sewage network and reuse system | Supply of sewage systems for the northern part of Tubas, Aqaba, and Tayaser and their installation with a total length of 50 km. Construction of a sewage treatment plant with a capacity of 2,400 cubic meters per day. Establishment of a system for the reuse of treated water for agriculture | sanitation | Improving the sanitation structure and services of collection, treatment, and reuse, which will contribute to solving environmental health and social problems as well as reusing treated water in agriculture | Tobas,Aqaba,Tayaser20000 people | 20,851,030$ | EU | | 2015-2019 | under implementaion |
Construction of water reservoir in Rantees | constructing a water reservoir with a capacity of 500 cubic meters | Tanks | increasing the quantity of potable water in Rantees Village | Rantis 3135 inhabitants | $421,243 | ANERA | 100% | 27/4/2015-3/6/2016 | completed |
The Jaffna streams transmission line project-Ein Sinya | Establishment of sewage line | sanitation | The transfer of sewage through the lines and keep it away from population | Jaffna 2135 inhabitants | 797,125NIS | PWA | 100% | 14/12/2014 -3/1/2016 | completed |