Clarification (2) for the First Works Package under the WSRP (Construction of Water Transmission Pipelines between Salem and Al Jalameh and Main Booster Pump Station), Reference PWA/WSRP/W01/RFB | سلطة المياه
Clarification (2) for the First Works Package under the WSRP (Construction of Water Transmission Pipelines between Salem and Al Jalameh and Main Booster Pump Station), Reference PWA/WSRP/W01/RFB
جميع الحقوق محفوظة © سلطة المياه الفلسطينية 2025