Clarification (4) for the First Works Package "Construction of Water Transmission Pipelines between Salem and Al Jalameh and Main Booster Pump Station", Ref. PWA/WSRP-SoP1/W01/RFB. | سلطة المياه
Clarification (4) for the First Works Package "Construction of Water Transmission Pipelines between Salem and Al Jalameh and Main Booster Pump Station", Ref. PWA/WSRP-SoP1/W01/RFB.
جميع الحقوق محفوظة © سلطة المياه الفلسطينية 2025