Clarification (2) and Amendment (4) for The Second Works Package Under the Water Security an Resilience Project "Construction of Water Transmission Pipelines Between Main Booster Pump Station and Regional Water Tank", Ref. PWA/WSRP-SoP 1/W02/RFB | سلطة المياه
Clarification (2) and Amendment (4) for The Second Works Package Under the Water Security an Resilience Project "Construction of Water Transmission Pipelines Between Main Booster Pump Station and Regional Water Tank", Ref. PWA/WSRP-SoP 1/W02/RFB
جميع الحقوق محفوظة © سلطة المياه الفلسطينية 2025