City: Tulkarem Project Goal: The pumping station will transfer water from the old reservoir by constructing the proposed water transmission lines and connecting them to the proposed new 500-cubic-meter reservoir. This will supply the town's high-altitude areas and serve approximately 5,000 residents. Project Status: under implementaion Start Date: 2023-01-01 ُEnd Date: 2025-04-01 Cost of Project: 699875.69 $ Benefited from project: 5000 Supporting entities: Water Authority budget Classification: Water
Project Components: Construction of a 500 m3 suspended reservoir, a 6" diameter, 3.8 km long transmission line, a 150 m long, 4" diameter feeder line, and a 60 m3/hour pumping station.