City: Jenin Project Goal: Protecting the pumping station and sewage manholes from rainwater that causes flooding in the treatment plant by constructing a separate 12- and 16-inch rainwater drainage system and replacing some of the sewage manholes in the plain area (adjacent to the pumping station) or pouring reinforced concrete around them. Project Status: completed Start Date: 2022-06-01 ُEnd Date: 2022-12-01 Cost of Project: 338858 $ Benefited from project: 2000 Supporting entities: French Development Agency Classification: wastewater
Project Components: Works contract: Construction of a separate rainwater drainage system using 12- and 16-inch UPVC pipes, and replacement of some sewage manholes in the plain area (adjacent to the pumping station) or pouring reinforced concrete around them. The project also includes a consulting services contract to supervise the project's work.