City: Gaza Strip Project Goal: Improving the quality of the aquifer by collecting, filtering, and purifying rainwater to reach the aquifer, as well as protecting residents from the risk of flooding in low-lying areas during the winter. Ensuring the continued operation of some facilities Project Status: completed Start Date: 2020-01-01 ُEnd Date: 2022-09-01 Cost of Project: 60000 $ Benefited from project: 280000 Supporting entities: UNICEF through the Kuwait Fund Program name: Project for the Construction of a Stormwater Drainage System and the Equipping of Water and Wastewater Facilities in the Gaza Strip with Solar Energy Classification: Mixed Projects
Project Components: The contractor will install solar energy systems for six water and wastewater facilities located in the Gaza Strip governorates.