Contract for the installation of a rainwater conveyor line in Khan Yunis City

City: Gaza Strip Project Goal: Improving the quality of the groundwater by collecting, filtering, and purifying rainwater to reach the aquifer, as well as protecting residents from the risk of flooding in low-lying areas during the winter. Ensuring the continued operation of some facilities. Project Status: completed Start Date: 2020-01-01 ُEnd Date: 2022-12-01 Cost of Project: 124700 $ Benefited from project: 280000 Supporting entities: UNICEF through the Kuwait Fund Program name: Project to construct a rainwater drainage system and equip water and sanitation facilities in the Gaza Strip with solar energy Classification: Mixed Projects Project Components: 24 buildings will be connected to a modern rainwater collection system.